The Gull Wing Bridge in Lowestoft provides a much needed third crossing over Lake Lothing. The bridge is a fine example of a bascule bridge and once in use it will be the largest bascule in the world lifted using hydraulic cylinders. Deep Soil Mixing Ltd opted to use our new ABI TM17 Mobilram to Read More
Tag: soil mixing
Case Study : Innovative Use of Wet Soil Mixing Technique
March 2018 saw our compact and versatile ABI Mobilram TM 14/17V rig head down to the Kent coast. This was a three month contract assisting Deep Soil Mixing Ltd (DSM) with their ground improvement works at the St Mary’s Bay redevelopment site. The ABI rig was coupled with a VDW 8360 Double Auger Head for Read More