The Port of Lowestoft, which is owned and operated by Associated British Ports (ABP), is undergoing extensive development as part of ABP’s Lowestoft Eastern Energy Facility (LEEF) to support the offshore energy industry. Key aspects of the project included the construction of three new berths and a reclamation area, implemented in two phases. The piling Read More
Category: Case Study
Case Study – Gull Wing Bridge
The Gull Wing Bridge in Lowestoft provides a much needed third crossing over Lake Lothing. The bridge is a fine example of a bascule bridge and once in use it will be the largest bascule in the world lifted using hydraulic cylinders. Deep Soil Mixing Ltd opted to use our new ABI TM17 Mobilram to Read More
Case Study – Pembroke Dock Marina Project
Earlier this year ABI Equipment Ltd supplied a Delmag RH34 drilling rig to BAM Nuttall for use on the Pembroke Dock Marina Project. This major infrastructure project is part of the £1.3 billion Swansea Bay City Deal which is developing a world-class centre fro marine engineering and is set to create around 1,800 highly skilled Read More
CaseStudy – Plastic Sheet Piling
There is a new case study available now in the Case Studies section of our website. It features the work of our TM14/17VSL and TM13 on two projects for RM McLeod. Both of these projects took place in Scotland and used plastic sheet piling. Plastic Sheet piles are ideally suited to water-based applications and the Read More
CaseStudy: ASEA Ecology Mitigation and Flood Defence Project
BAM Nuttall and Mott MacDonald have recently carried out much needed flood defence works at Avonmouth in the Southwest of England. The work is part of major flood defences along the river Severn estuary and involved the installation of 26,250 linear meters of steel piles along 2100m of shoreline. In addition to this, concrete walls Read More