The new sea defences at Dawlish help to protect the stretch of railway line, from Exeter St. David’s to Plymouth, that was washed away during the winter storms of 2004. During the winter of 2020/21 our Delmag RH34 worked with the team at BAM Nuttall Ltd to install the piling for the project. The tidal Read More
Posts by Eleanor Lester
CaseStudy: Geothermal Investigation Glasgow
Over the years we’ve been involved with a variety of projects serving the sustainable energy market. In the main these have been for windfarms, both on and offshore, however we have also turned our hand to geothermal borehole drilling. In the summer of 2019, we were called upon by BAM-Ritchies to supply a Delmag RH28 Read More
CaseStudy: Ground Preparation Works, Salter Street London
It’s not often we find ourselves on site in time for the groundbreaking ceremony but that’s what happened on site at Salter Street, London for our colleagues Martello Piling Ltd. Two of our Delmag RH34 drilling rigs were required to undertake ground preparation works before installing foundation piles on the site located between the West Read More