CaseStudy: Vibro Stone Columns

Vibro stone columns are a ground improvement technique, used to stabilise areas of weak or variable soils or made ground.  During 2021/22 ABI Equipment provided Tritech Ground Engineering with an ABI TM 13 Mobilram for various projects across the UK.  On each occasion the rig was used to install Vibro-Stone Columns.  Each site was treated Read More

CaseStudy: High Speed 2, Chiltern Line, West Ruislip

High Speed Two (HS2) is a major rail infrastructure project that will see the building of a new high speed railway line linking London, Birmingham, Leeds and Manchester with connections to the existing rail network.  During the spring of 2021 an ABI TM22 Mobilram and a Delmag RH34 drilling rig worked together to install sheet Read More

ABI Gruppe News 2021

The latest issue of ABI Gruppe News is now available with some fantastic content. There’s an in-depth case study (P4) on the UK’s smart motorway upgrade infrastructure project.   A wide variety of ABI Mobilrams were used on these projects including the TM22, TM20, TM17, TM14/17VSL, TM14/17V and TM13.  The rigs have been used for the Read More

Case Study – Smart Motorway Upgrade Projects

The UK’s motorway network is currently undergoing a major upgrade with the installation of smart motorway technology being installed.  This major infrastructure work has continued despite the challenges of Covid-19 and the global pandemic. A wide variety of ABI Mobilrams have been used on these projects including the TM22, TM20, TM17, TM14/17VSL, TM14/17V and TM13 Read More